Experience


Prefabricated power house and Electrical Equipment, Gladstone LNG

Year : 2012-2013

System : LV & MV Switchgear

Supply : Cable Schedule & As-built Drawing, Pre-comm&Comm LV MCC Panel.

 

 

 

YAMAL LNG Project – SABETTA, RUSIA

Yamal LNG is a proposed liquefied natural gas plant at Sabetta, north-east of the Yamal Peninsula, Russia. The project is expected to cost US$27 billion.The power plant will have capacity of 282 MW.

The Yamal LNG project is based on the feedstock resources of the South-Tambeyskoye field located in the north-east of the Yamal Peninsula on the coast which is located on the estuary Ob Bay, is ice-
encrusted for the majority of the year. South-Tambeyskoye field are estimated at 926 billion cubic meters of natural gas and 30 mmt of liquid hydrocarbons. YAMAL LNG Project with 29 Modules in separate BATCH :1,2,3,4,5

E-Houses(Modular) Equipment and Component:

  • 110kV Gas Insulated Switchgear (SF6-GIS).
  • Relay Control Panel (RCP) measuring panel for 110kV GIS.
  • 35kV Gas Insulated Switchgear (SF6-GIS)
  • 10kV/6.6 Air Insulated Switchgear (AIS) type NXAir-P and NXAir World.
  • 0.4kV LV MCC Switchboard type SIVACON S8.
  • Relay Protection (SIPROTEC siemens) with various type such as 7SJ62,7SD61,7SJ64,7SJ63
  • Power Distribution and Control System
  • Busbar/Busduct (Sandwich type LS-Busduct) installation&connection
  • Interlooping and modification wiring of Switchgear.
  • F&G system such as Fire suppression (Novec Cylinder skid, Selector valve skid,PAE skid, Gaseous Extinguishes panel/GEP,sounder,beacon,etc)
  • Transformer, NER (incl. assy of enclosure)
  • HVAC
  • Preservation/Winterisation

Control system components :

  • Protection Relay with system software : DIGSI 4 and 5
  • SIMOCODE pro V for PROFIBUS with system software : SIMOCODE ES
  • PDCS with system software : PCS7 + Power Control
  • CT/VT with system software : Primary Test Manager
  • Transducer with system software Simeas P or T
  • Metering
  • Busbar

Test Equipment :

  • Secondary Current Injector : OMICRON CMC356
  • Primary Current Injector : OMICRON CPC100
  • Insulation resistance test : Megger MIT515
  • RTD Simulator

 

Yamal LNG, Siemens Turkey – Oil & Gas Industry

Year : 2015 – 2016

System : MV switchgear

Supply : Realization & programming protection relay for MV – Siprotec IV & V, performing function test & protection test on FAT & IFAT

 

Petrobras P76  Project, Siemens Singapore Batam Oil & Gas Industry

Year : 2015

System : LV & MV Switchgear

Supply : Realization  &  programming  protection relay  for  LV & LV Switchgear–Siprotec IV, Performing Function  test  & protection teston IFAT

 

 

 

 

 

UPPER ZAKUM(UZ750) Project – Petrofac, Abu Dhabi

The project is being carried out by Petrofac Emirates through its joint venture Mubadala Petroleum and Daewoo Shipbuilding & Marine Engineering (DSME) under a contract worth $3.7bn. The project is expected to increase the production capacity by a further 150,000 bpd. UZ750 Project with 6 Modules(9 line up of switchboard system).

 

 

E-Houses(Modular) Equipment and Component:

  • 0.4kV LV MCC Switchboard type SIVACON S8
  • Integrated Protection and Control Monitoring system (IPCMS)
  • Interlooping and modification wiring of Switchgear

Control system components :

  • Protection Relay (SIPROTEC) 7SJ62 with system software : DIGSI 4
  • SIMOCODE pro V for PROFINET with system software : SIMOCODE ES
  • PLC Siemens S7 series : S7-1200 (control ATS/MTS with communicate to SIPROTEC Relay via Ethernet) and S7-400 (control of Motor with communicate to SIMOCODE via profinet) with system software TIA Portal V13

 

Yamal LNG, Siemens China – Oil & Gas Industry

Year : 2015 – 2016

System : LV & MV switchgear

Supply : Realization & programming protection relay for LV & MV switchgear, realization & programming Simocode Pro, performing function test & protection test best essay writing service uk on FAT & IFAT

 

 

 

EXXON project – C0-Gen, Singapore

Year : 2016

System : LV & MV Switchgear

Supply : Function test & Siemens Siprotec Relay , Installation of LV& MV Panel Siemens Switchgear.

 

 

 

 

 

 

Yamal LNG, YAMGAZ China  at BOMESC Shipyard – Tianjin

Year : 2016

System : LV switchgear & SCADA System

Supply : Realization & programming protection relay for LV switchgear, function test & protection test LV MCC – SIPROTEC IV, energizing PDCS server panel

 

 

 

Jangkrik Project – SAIPEM, Batam

Year : 2016

System : LV & MV Switchgear and MV Drive

Supply : Function test & Siemens Siprotec Relay , Installation of LV& MV Panel Siemens Switchgear, Motor relay MV Drive.

 

 

 

 

 

 

Upper Zakum 750 Project,  Siemens-DSME, Offshore Island Site, Abu DhabiOil & Gas Industry

Year : 2017- untill now (  Still On Going)

System : LV Switchgear

Supply : Function test & Commissioning LV MCC(Siprotec IV & Simocode Pro VPN), LV MCC integrated test to Scada Scheneider  IPCMS & SCMS.